ISLES954 - Construction Maamigili Domestic Airport
 
Category(ies):  Airport Construction
Start Date: 01/08/2001 Implementing Agency: VILLA SHIPIPNG AND TRADING CO. PVT. LTD.
Expected Completion Date: 31/08/2011 Executing Agency: - n/a
Cost: Rf  308,400,000.00 Funding Type(s):
Revised Cost:      
Related Pledges: Financial Source(s): VILLA SHIPIPNG AND TRADING CO. PVT. LTD.
Status: On-going Tag(s):
Status Description: - Agreement signed on 22/08/2001.
- Overall project's 79% completed.
- Run way and Taxi way completed.
- Terminal Building 45% complete; temporary terminal work (which would be future cargo terminal) skeletal structure
completed, roof work about 60% completed.
- Hanger Building Structure erection completed, mezarine work on eastern wing is completed (2 floors), concrete work
for the mezzarine on the western wing in progress, stairs completed, ground floor leveling in progress.
- Control Tower concrete work completed. Control Tower shell windows fitted, roller doors installed, Control Tower
exterior paint in progress, cab roof rails in work, stairs and belcony railings fitted.
- Runway surface markings in progress. Souther end runway 27 and runway 09 edge light cables installation in work.
Edge light foundations installed, runway 27 end light cut outs bored. Runway centre line marked. Runway edge lights
and taxi way light installation positions surveyed and marked.

Delays:
- Delays in land reclamation for the project, sourcing of materials like Asphalt, rasing finance etc.
Summary Scope of the project:
- Reclaim land to develop a domestic airport at Maamigili Island, A.Dh. Atoll.
- Develop the required infrastructure to operate the domestic airport.
- To train and employ and manage the Airport.

Objectives:
- To provide safer and 24 hour air transport for the residents and tourists destined to A.Dh. Atoll and close proximity.
- To provide employment opportunity to the residents of Maamigili and neighbouring islands.
- To attract more developmental projects to Maamigili and closeby islands.
Added By: Ifran Waheed - 21/04/2010 11:00:32 AM
Last Edited By:  Ifran Waheed - 06/12/2010 10:49:02 AM


Last Edited By: Ifran Waheed - 06/12/2010 10:49:17

#IslandAtollStatusStart DateExpected End DateCostFinancial Source(s)Details
1 MaamigiliAlifu DhaaluOn-going01/08/200131/08/2011 Rf  308,400,000.00 - VILLA SHIPIPNG AND TRADING CO. PVT. LTD.
- Agreement signed on 22/08/2001. - Overall project's 79% completed. - Run way and Taxi way completed. - Terminal Building 45% complete; temporary terminal work (which would be future cargo terminal) skeletal structure completed, roof work about 60% completed. - Hanger Building Structure erection completed, mezarine work on eastern wing is completed (2 floors), concrete work for the mezzarine on the western wing in progress, stairs completed, ground floor leveling in progress. - Control Tower concrete work completed. Control Tower shell windows fitted, roller doors installed, Control Tower exterior paint in progress, cab roof rails in work, stairs and belcony railings fitted. - Runway surface markings in progress. Souther end runway 27 and runway 09 edge light cables installation in work. Edge light foundations installed, runway 27 end light cut outs bored. Runway centre line marked. Runway edge lights and taxi way light installation positions surveyed and marked. Delays: - Delays in land reclamation for the project, sourcing of materials like Asphalt, rasing finance etc.
Government of Maldives - 2014